Mark Complete, Target Phases, and Phase Change Lines are three tools that can be used in activity tracking sessions to monitor student progress.

Mark Complete is used to visually track and monitor the completion of instruction throughout a tracking session. Mark Complete can also be used to review all data collected in a session and confirm that you want to keep data (have it graphed) or discard.


Target Phases indicate the current phase of instruction. Target Phases default to "Not Specified," but can be changed to help inform instructional practices and indicate if the target(s) should be baselined, are in teaching, require an intervention, etc.

When the target phase is updated, it will appear to the right of the target in the tracking screen and within the “Mark Complete” modal.




Phase Change Lines identify different phases of instruction or changes in instructional conditions (e.g., Baseline, Teaching, Generalization, and Maintenance.) A phase change line is a vertical dashed line populated on a graph to indicate a new phase has occurred.

Phase Change Lines can be populated from the tracking session screen at an individual and multi-target level.